Fairfield Concrete: Sacred Heart Dorm Construction Project

Suzio York Hill was called upon by Campuatro & Son for the Sacred Heart North Dorm project in December 2022. Suzio York Hill provided 150cy of 4000psi, 3 Stone, 2%NCA, Super, VaporLock, No Air, floor/deck slab pour.

Self Storage Concrete Construction Project

Suzio York Hill was called upon by Turner Brothers LLC for the project Self Storage at location 975 Lordship Blvd, Stratford, CT, in December 2022. Suzio York Hill provided 450cy of 400psi, 3 stone, 2%NCA, Midrange, loading dock outside apron pour.

201 Munson St Apartment Complex

Suzio York Hill was called upon by RC Structures Inc for the 201 Munson St Apartment Complex project in December 2022.

201 Munson St Apartment Complex Apartment Floor Slab Pour

Suzio York Hill was called upon by RC Structures Inc for the 201 Munson St Apartment Complex project in November 2022.

Foundation Footings Pour at 201 Munson St Apartment Complex

Suzio York Hill was called upon by RC Structures Inc for the 201 Munson St Apartment Complex project in November 2022.

33 Defco Park Rd, North Haven

Suzio York Hill was called upon by Wetteman Bros Concrete LLC for the 33 Defco Park Rd, North Haven project in December 2022. Suzio York Hill provided 150cy of 4500psi, 3 stone, 2%NCA, midrange, no air, floor slab pour. 

101 College St. Building Concrete Construction Project

Suzio York Hill was called upon by Manafort Brothers Inc in December for the 101 College St. building project. Suzio York Hill provided 320cy of 400psi, 3 stone, 1% NCA, Super, Hydration Stabilizer, Viscosity Modifier No air, deck slab pour.

Southern CT State Univ. Sidewalk Pour Project

Suzio York Hill was called upon by Sil-Car Corporation for the Southern Connecticut State University project in December 2022. Suzio York Hill provided 6cy of Class F, 2%NCA, sidewalk pour. 

85 East St, New Haven

Suzio York Hill was called upon by the Strike Operating Company LLC for the 85 East St, New Haven Project in December of 2022. Suzio York Hill provided 5cy of 5000psi , 3 Stone, Super, bollard foundation pour. Since we were not able to dig we designed a "slab foundation" for bollards.

North Branford High School Phase 2 Construction Project

Suzio York Hill was called upon by Colossale Concrete Inc for the North Branford High School Phase 2 project in December 2022. Suzio York Hill provided 20cy of 45000psi, 3 Stone, 2%NCA, Midrange, VaporLock. 

Yale NH Hospital / St. Raphael's Parking Garage

Suzio York Hill was called upon by Manafort Brothers LLC for the Yale NH Hospital / St. Raphael's Parking Garage Project in November 2022. Suzio York Hill provided 270cy of 4000psi, 3 Stone, and foundation footing pour. 

Downtown Meriden Improvements

Suzio York Hill supplied materials for many of the ongoing improvements to downtown Meriden, CT, done in conjunction with LaRosa Construction of Meriden.

Amtrak Renovations

Suzio York Hill supplied materials for the Amtrak renovations in Meriden, Berlin and Wallingford, CT, done by Judlau Contracting of New York.

Baseball Fields

Fibers, along with other admixtures, allowed Natale Concrete Construction of Bloomfield, CT to meet the owners’ specifications of this first-of-its-kind slip formed curb design.

Residential Patio Placement

Conte Construction of Norwalk, CT chose the Nutmeg color concrete for a patio placement.

Stevenson Dam

A completely dry-batched, micro silica mix design allowed Knowles Industrial Services of Gorham, ME to run hundreds of feet of hose to accomplish the dam's resurfacing.

Lockup Storage

A superplasticizer mix helped Complex Construction of Oxford, CT's tilt-up wall placements go well for the Lockup Storage project.

Quinnipiac University York Hill Campus

The L. Suzio Companies worked closely with O&G Industries of Torrington, CT in developing Quinnipiac University's York Hill Campus, complete with new suite-style residence buildings, a student center and a five-story parking garage.

Yale’s Ingalls Rink Renovation and Addition

The L. Suzio companies were called upon by S&F Concrete of Massachusetts and Epifano Builders of Stratford, Connecticut to provide their materials for Yale’s Ingalls Rink Renovation and Addition.

Klean Energy

The L. Suzio Concrete Company was part of a large-scale project producing a 620 MW Combined Cycle Electric Generating Facility, being done by O&G Industries of Torrington, CT.

Yale History of Art Academic Building

The L. Suzio Companies teamed up with Rhode Island-based J.L. Marshall in developing another Yale-affiliated building which spans over 84,000 square feet to be used by the History of Art department.

Yale’s Forestry & Environmental Studies Building

The L. Suzio Companies teamed up with J.L. Marshall of Rhode Island in developing Yale’s Forestry & Environmental Studies Building.

The Smilow Cancer Hospital

The L. Suzio Companies paired with Manafort Brothers Inc. of Plainville, Connecticut in developing The Smilow Cancer Hospital at Yale-New Haven.